The
Two RV Gypsies: Full-Time RVers traveled in their RV from West Virginia to Pittsburgh, Pennsylvania June 11, 2021 |
to |
Below: The two RV Gypsies drove their RV and toad on the Pennsylvania Turnpike even though it cost a lot in tolls. |
|
Squirrel Hill Tunnel serves as an eastern gateway to Pittsburgh via I-376. It was completed after 8 years of construction at a cost of $18 million. At the time of opening, it was the single largest investment by the State of Pennsylvania Transportation Department. It is 4,225 feet long. Construction began in 1946 and opened to traffic on June 5, 1953. |
|